MKC Infrastructure emerges as L1-bidder for BESS project at NTECL Vallur plantIllustrative image – not actual.

MKC Infrastructure has emerged as the lowest bidder (L1) for  installation of the Battery Energy Storage System (BESS) to enhance energy storage and grid reliability at the NTECL Vallur power plant in Tamil Nadu.

The EPC package involves the development and implementation at the power station. The successful bid of Rs 406.20 crore by the company reflects MKC Infrastructure's capability in handling large-scale energy projects, contributing to NTPC’s push towards sustainable and efficient energy solutions.

This project will play a crucial role in enhancing energy storage and distribution, aligning with NTPC’s long-term goals of boosting grid stability and integrating renewable energy sources.

← All latest storiesBack to top →