Mittal shortlists locations for Jharkhand steel plantIllustrative image – not actual.

The LN Mittal group has shortlisted three locations for its proposed integrated steel plant in Jharkhand. The sites are Manoharpur, Chandil and Chaukra Kandra, all in the proximity of state capital Ranchi.

A 14-member team of Mittal Steel is currently in Jharkhand to work out project details. The team is studying various aspects like plant location, financing, raw material linkages and costing.

No final decision about the project has been taken. The Mittal group had, in early May 2005, proposed to set up a greenfield integrated steel plant of 5 million tpa in Jharkhand.

Also See:

LN Mittal proposes greenfield steel plant in Jharkhand (07-May-05)

← All latest storiesBack to top →