Illustrative image – not actual.
The Ministry of Railways has planned to electrify balance Broad Gauge (BG) routes of the Indian Railways by December 2023.
The Ministry has planned 6,000 km route each for 2019-20, 2020-21 and 2021-22. It has planned 6,500 km route electrification for 2022-23.
A total of 4,310 km route electrification will be done up to December 2023. In all a total of 28,810 km route electrification will be carried out.
Initially, the Indian Railways has planned to source about 1,000 MW solar power as part of its Solar Mission and around 200 MW wind power-based on techno-commercial assessment.
Of this, around 204.82 MW (101.42 MW solar and 103.4MW wind power) renewable power has already been set up.
