The Union commerce ministry has notified minimum area requirements for special economic zones. In a meeting held on 6 June 2006, the ministry decided to retain the minimum land area requirement for IT SEZs at 10 ha with a minimum built-up area of 1 lakh sq.m.

For gems and jewellery, the minimum land area will be 10 ha with 50,000 sq.m. of built-up area. For biotechnology and non-conventional energy related SEZs, the corresponding metrics will be 10 ha and 40,000 sq.m.

For all other types of SEZs, the minimum land requirement will be the same, viz. 1,000 ha for multiproduct SEZs and 100 ha for multi-services or sector-specific SEZs.

Also See:

SEZ Act comes into force (11-Feb-06)

← All latest storiesBack to top →