Metro Railway, Kolkata floats tender for execution of balance workIllustrative image – not actual.

The Metro Railway, Kolkata, has floated tender for execution for balance work in connection with extension of Metro Railway in West Bengal.

The scope of work envisages execution of balance civil engineering works of PSC viaduct from Noapara to the TJE end of existing RCC ramp of Airport Circular Railway Track (approx ch 3.860 km from Noapara) including work in Noapara Yard in connection with extension of Metro Railway from Noapara to NSCB Airport in West Bengal.

The work will entail an investment of Rs 172.4 crore.

← All latest storiesBack to top →