Illustrative image – not actual.DMRC is likely to inaugurate the Central Secretariat-Qutub Minar corridor shortly.
The inauguration of the 12.53 km line is likely to take place after the Commissioner of Metro Rail Safety inspects the entire corridor and gives his mandatory safety clearance.
Once the Central Secretariat-Qutub Minar corridor is opened and integrated with the existing 14.47 km Qutub Minar-HUDA City Centre line, it is expected to reduce travel time between Delhi and Gurgaon. The Central Secretariat-HUDA City Centre (Gurgaon) line is likely to be integrated to the existing Central Secretariat-Jehangirpuri corridor.
The entire 42 km from Jehangirpuri to Gurgaon will be covered in less than 90 minutes.
Currently, trial runs on the corridor are being conducted and the civil structure are being checked to ensure there is no physical blockage during the movement of the train on the track.
Related Links:
Project profile
Addendum:
Sheila Dikshit, Chief Minister of Delhi and S Jaipal Reddy, Urban Development Minister, Delhi, on 3 September 2010 inaugurated the Central Secretariat-Qutub Minar metro corridor in Delhi.
