Megha Engineering bags various ordersIllustrative image – not actual.

Megha Engineering and Infrastructure (MEIL) has bagged various orders in the water and power sector.

MEIL has bagged an order to build, own, and operate a 50-MW solar thermal plant at a cost of Rs 765 crore in Andhra Pradesh under the Phase I of the JNNSM. The 114 million units of power to be generated per annum from the 50 MW unit will be sold to NTPC Vidyut Vyapar Nigam (NVVN)). The project is slated to be operational within 30 months.

Further, the company has secured two major work orders worth Rs 287.5 crore from the Narmada Water Resources Department of the Gujarat Government. The scope of work includes construction of pumping station, supplying and laying of 2,350 mm diameter pipeline near Changa to Sujalam Suphalam canal and another pipeline project from Rampura to Bhadath and construction of pumping house at Rampura in Gujarat. These are to be executed within 24 months.

← All latest storiesBack to top →