Illustrative image – not actual.
Mecasolar has supplied over 3,400 Mecascrew foundation screws to a 3 MW solar photovoltaic plant being developed by Martifer Solar in Lorca, Murcia, Spain.
The screws were optimized following the local load characteristics, with tests showing a 15-tonne force required for removal, Mecasolar notes. As required by the characteristics of the site in Lorca, the screws were installed following drilling for stronger mounting.
Source: Solar Server
