Illustrative image – not actual.Mumbai Port Trust (MbPT) is unlikely to go ahead with its proposed International cruise terminal plan as the Indian Navy has refused permission to set up the terminal at Oyster Rock, south of Apollo Bunder near Sassoon Docks, on security grounds.
MbPT is planning to set up the terminal at an estimated cost of Rs 1,844 crore to attract global cruise liners and tourists. It is likely to be constructed on a BOT basis, with the private operator investing Rs 1,544 crore and Rs 300 crore by MbPT.
MbPT is likely to look after the dredging, navigational aids and harbour security and it is expected to get a revenue share of at least 10 per cent. The facilities at the cruise terminal are expected to include a home port terminal offering a draft (depth) of 9.8 mtrs, a port of call terminal with a draft of 11.5 mtrs, baggage scanning, and immigration and security checks.
