Illustrative image – not actual.<p style="margin: 0px; text-align: justify;">
MBL Infrastructures has bagged a road project in Madhya Pradesh.</p>
<p style="margin: 0px; text-align: justify;">
 </p>
<p style="margin: 0px; text-align: justify;">
The project worth Rs 212 crore has been awarded by the Madhya Pradesh Road Development Corporation (MPRDC) for developing the Seoni-Katangi to Maharashtra Border Section of State Highway-54 of Madhya Pradesh on BOT (toll) basis. The concession period is 30 years and MPRDC will contribute non-refundable grant/subsidy of Rs 59.85 crore. The length of the project highway is 75.60 km and the construction period is 730 days. The project will be executed through a 100 per cent owned subsidiary of MBL.</p>
<p style="margin: 0px; text-align: justify;">
 </p>
<p style="margin: 0px; text-align: justify;">
<span style="font-weight: bold;">Related Links:</span><br />
<a href="/Projects/ProjectDetails.aspx?pid=72482" target="_self">Project profile</a></p>
<br />
