Illustrative image – not actual.The MMRDA is likely to float tenders for the proposed funicular railway at Matheran soon. The DPR for the PPP project has been prepared by RITES and presentation of RFQ and RFP documents are underway.
The project entailing a cost of Rs 100 crore will cover a route of 1.3 km from Dodhani village near Panvel to Maillot Spring Point. Two cars having capacity of carrying 60 passengers each are to be guided by cables along the tracks.
Currently, a narrow-gauge railway line connects Neral and Matheran on the Central Railway's Mumba-Pune route. This line is 20 km long and takes about two hours.
