Illustrative image – not actual.Masdar, Abenoga SA (Seville, Spain) and Total SA (Courbevoie, France) partnered to commission the plant through the Shams Power company, which began construction in July 2010.
Shams 1 is located at Madinat Zayed, in the UAE desert 120 kilometers from Abu Dhabi. The plant utilizes a parabolic trough CSP design, comprising 768 collectors using Flabeg mirrors over an area of 2.5 sq km. Schott PTR 70 absorber tubes carry Solutia heat transfer fluid, supplying heat to power a 125 MW MAN Turbo steam turbine.
Source: SolarServer
