Illustrative image – not actual.Maruti Suzuki India (MSI) is planning to set up a diesel engine plant at its Gurgaon facility in Haryana by 2014.
MSI will invest Rs 1,700 crore for the proposed plant with a production capacity of three lakh units per annum. The facility will be built in phased manner. It will have an initial capacity of 1.5 lakh units per annum under the Phase I at an investment of Rs 950 crore. The facility is slated to begin operation by June 2013.
Presently, MSI’s Gurgaon plant produces all types of petrol engines and has a capacity of over eight lakh units per annum.
