Illustrative image – not actual.Around 60 per cent work has been completed on the 12-km Maroshi Ruparel Water Supply Tunnel Project in Mumbai.
Hindustan Construction Company (HCC) is executing the project entailing a cost of Rs 415 crore. It involves construction of three-metre finished diameter water supply tunnel 12-km long from Maroshi through Vakola and Mahim to Ruparel College.
The project is one of the three mega underground tunnel projects currently underway in the city. The other two are the 3.6-km tunnel from Malabar Hill to Cross Maidan and the 6.1-km tunnel from Verawali to Yari Road.
Related Links:
Project profile
