Illustrative image – not actual.
The construction on five major road infrastructure development projects was launched by Governor of Ladakh Radha Krishna Mathur, from Turtuk in the Union Territory of Ladakh.
Following the MoU, signed on 03 September 2021, between the Ladakh Administration and the Border Roads Organisation (BRO), projects involving construction/improvement of roads and tunnels were assigned to BRO for development of connectivity in the hilly region.
The five projects kicked off include preparation of greenfield alignment and upgradation of major single lane roads to double-lane (NHDL specification) and tunnelling works.
The construction of road Hanuthang-Handanbroke-Zungpal-Turtuk, the 26.6 km long greenfield road, is planned to provide inter valley connectivity between Hanuthang-Handanbroke (Indus Valley) and Zungpal-Turtuk (Shyok Valley) across the Stakpuchan range.
This will also reduce travel time to three-and-a-half hours from the existing nine hours to Turtuk via Leh without crossing the treacherous Khardungla pass.
The upgradation of four major single-lane roads has also commenced. These roads are, 78 km road Khalse to Batallik; 50 km road Kargil to Dumgil which will also include construction of a tunnel at Hambotingla to ensure seamless connectivity from Kargil to Batallik;70 km road Khalsar to Shyokvia Agham and 31 Km Tangtse to Lukung.
All these roads are used extensively by travellers to reach the sought-after tourist destinations such as Hundar, Turtuk village, Shyok, Pangon-Tsolake and Aryan villages of Dah, Garkone Darchik, etc.
BRO is already maintaining 5,000 km road and will be constructing 1,500 km more roads in near future.
