Chinese power utility company, Mainland
China, is planning to pick up a 15 per cent stake in Central India Power Co Ltd
(CIPCL) which is setting up a 1,084 MW coal-based power project at Bhadravati
in the Chandrapur district of Maharashtra, with a project outlay of $1.4
billion (approx Rs.6,000 crore).
Mainland
China is picking up the stake that was held by Electric de France until it
exited from the project in July 2000. Of the total equity of CIPCL, the Ispat group
holds 50 per cent and Alstom Power, 35 per cent.
The
Bhadravati Power Project, conceived in 1993 as a fast-track project, is still
in a state of limbo following uncertainties over the supply of coal. The
project had earlier envisaged sourcing of coal from a proposed joint venture
between the Ispat group and Rio Tinto of UK. The Union government had then
disallowed the joint venture owing to the proximity of the proposed coal
company to some defence unit. Subsequently an agreement was reached between Ispat
and Western Coalfields Ltd for the supply of coal.
