Chinese power utility company, Mainland China, is planning to pick up a 15 per cent stake in Central India Power Co Ltd (CIPCL) which is setting up a 1,084 MW coal-based power project at Bhadravati in the Chandrapur district of Maharashtra, with a project outlay of $1.4 billion (approx Rs.6,000 crore).

 

Mainland China is picking up the stake that was held by Electric de France until it exited from the project in July 2000. Of the total equity of CIPCL, the Ispat group holds 50 per cent and Alstom Power, 35 per cent.

 

The Bhadravati Power Project, conceived in 1993 as a fast-track project, is still in a state of limbo following uncertainties over the supply of coal. The project had earlier envisaged sourcing of coal from a proposed joint venture between the Ispat group and Rio Tinto of UK. The Union government had then disallowed the joint venture owing to the proximity of the proposed coal company to some defence unit. Subsequently an agreement was reached between Ispat and Western Coalfields Ltd for the supply of coal.

← All latest storiesBack to top →