Maharashtra govt gives in-principle approval for Thane Creek bridgeIllustrative image – not actual.

The Maharashtra Cabinet’s sub-committee on infrastructure headed by Chief Minister Devendra Fadnavis has given in-principle nod to a proposal to build third bridge over Thane Creek.

 

The bridge, which is part of the proposed road connecting Vashi’s Sector 24 with Kharghar and includes a tunnel through the Parsik Hill, is expected to cost the state Rs 560 crore.

The project will be jointly executed by the Maharashtra State Road Development Corporation (MSRDC), the City and Industrial Development Corporation (CIDCO) and the Maharashtra Industrial Development Corporation (MIDC). The proposed third bridge over Thane Creek will be a six-lane stretch, three lanes each on either side of the existing bridge.

The work on the bridge will start in November 2018 and it will take around three years to complete the work.

← All latest storiesBack to top →