Illustrative image – not actual.
Maharashtra Chief Minister Eknath Shinde on 11 March, 2024 inaugurated the first phase of the coastal road between Worli and Marine Drive in south Mumbai. Deputy Chief Ministers Devendra Fadnavis and Ajit Pawar were also present at the inauguration of the south-bound corridor of the coastal road.
The 53-km-long coastal road, being constructed till Dahisar, will help people save fuel and time, besides reducing pollution, the Chief Minister said. The project also includes underground tunnels, arterial roads and interchanges. A 10.5-km stretch will be opened for traffic in the first phase, alowing motorists to enter the coastal road from Worli Seaface, Haji Ali interchange and Amarson’s interchange points, and exit at Marine Lines.
The second phase will be opened for traffic in May 2024. The Worli to Marine Drive stretch will be covered in 10 minutes, down from the 40-45 minutes currently. It will be open for traffic from 8 a.m. to 8 p.m. from Monday to Friday. No vehicular movement will be allowed on weekends. Heavy vehicles (excluding BEST and ST buses, passengers carrying vehicles) are restricted from entry, while two-wheelers, three-wheelers, pedestrians will be prohibited altogether.
The Chief Minister informed that 175 acres of green space is being developed as part of the coastal road project. Thus, Mumbai will get a central park spread over around 300 acres.
