Illustrative image – not actual.The Maharashtra government has approved a revised plan for Mumbai Metro Line 5 along with its extension and the newly proposed Line 5A, significantly boosting the region’s urban transport infrastructure.
The updated project cost has risen to Rs 18,131 crore, reflecting major design changes and expanded connectivity goals across the Mumbai Metropolitan Region (MMR). The integrated metro corridor will improve connectivity between key growth centres such as Thane, Bhiwandi, Kalyan and Ulhasnagar, supporting daily commuters and improving access to emerging residential and industrial hubs. Originally sanctioned in 2017 as a 25 km elevated corridor, the project has undergone several revisions due to land acquisition challenges and rehabilitation issues, particularly in densely populated areas like Bhiwandi and Kalyan. A major redesign in 2023 introduced an underground section between Dhamankar Naka and Temghar to reduce surface disruption, although this increased costs.
The updated plan also replaces the earlier extension to Kalyan APMC with a new Line 5A route linking Durgadi to Ulhasnagar via Aadharwadi, Khadakpada and Bhoirwadi, enhancing last-mile connectivity. Additionally, a double-decker structure at Ranjnoli Junction will integrate a flyover and metro line to ease congestion and optimize space usage.
