L&T’s Heavy Civil Infrastructure vertical wins order for Agra Metro networkIllustrative image – not actual.

Larsen and Toubro's (L&T) Heavy Civil Infrastructure vertical has won an order from Uttar Pradesh Metro Rail Corporation (UPMRCL) for the design and construction of Agra Metro Phase-I, Line-2. The stretch will extend from Agra Cantonment to Kalindi Vihar.

The work encompasses the design and construction of an 15.09 km elevated viaduct, 14 stations and 2.61 km depot connecting the metro line from Sadar Bazar to PAC Depot. Architectural finishes for the stations, as well as electrical & mechanical works are also covered in the scope. The project is to be completed within a timeline of 30 months.

This project will leverage L&T’s extensive expertise in engineering and high-quality execution, as it contributes to India’s metro networks in line with its strategic goals.

← All latest storiesBack to top →