L&T has received an order worth Rs 1,302 crore from Petroleum Development Oman.

The scope of work involves EPC work for the Saih Rawl Depletion Compression project Phase II (SRDC2) - which is basically to keep up the production of natural gas from the field at the desired level. The SRDC2 involves installation of 76 MW of gas compression capacity with four trains and modification of the condensate handling system at central processing platform. This will enable the Saih Rawl main field to produce maximum annual daily load of 30 mmscmd of gas.
 

← All latest storiesBack to top →