L&T Metro conducts trial run at KukatpallyIllustrative image – not actual.
L&T Metro Rail Hyderabad (L&TMRH), conducted a trial run from Miyapur depot to Kukatpally, a 4.4 km stretch.

 

The route comes under the Corridor One route of Miyapur to L B Nagar -- a total route length of 29.87 km.

 

Although the 10 overhead stations of the second construction stage of Miyapur-S R Nagar are almost ready, the electrical inspector general of the metro rail has given permission to the authorities concerned for running the trial run upto four stations to begin with, rather than a straight stretch of 10 km.

 

More Project Info:
Hyderabad Elevated Metro Project

← All latest storiesBack to top →