Illustrative image – not actual.Phase I of L&T Hitech City, the first of the five towers being developed in the Vijayawada IT/ITES SEZ at Kesarapalli in Andhra Pradesh is expected to be ready for occupation by end-July 2009.
The proposed IT park is being implemented by the JV of L&T and the Andhra Pradesh Industrial Infrastructure Corporation (APIIC). The first IT tower is developed on 1.92 lakh sq ft of built-up area, which is likely to be inaugurated by the State Chief Minister.
The first tower is a four-storyed structure on stilts having a large floor plate of 39,000 sq ft. The tower built with low column density and impressive high ceiling, having double height entrance lobby and spacious lift lobby and various modern amenities like food court, amphitheatre etc.
Also See:
L&T plans investment in power, port projects (21-Jul-09)
Related Links:
Project profile
