Illustrative image – not actual.
The Transportation Infrastructure business of L&T Construction, the construction arm of Larsen & Toubro (L&T) has secured another mega contract from the National High-Speed Rail Corporation (NHSRCL). The value of the contract is more than Rs 7,000 crore.
The scope of work involves construction of 87.569 km stretch of the Mumbai-Ahmedabad High Speed Rail (MAHSR) project.
This order to construct the C6 Package of MAHSR comes at the back of the earlier one for the C4 Package of the project, the biggest EPC contract awarded in the country to date, involving the construction of a 237.1 km stretch.
The scope of the MAHSR-C6 Package includes the construction of viaducts, one station, major river bridges, maintenance depots, and other auxiliary works. This particular package represents 17.2 percent of the total length, running elevated from the outskirts of Vadodara to the outskirts of Ahmedabad in the state of Gujarat with one station at Anand / Nadiad.
The 508 km long Mumbai-Ahmedabad High-Speed Rail project will cover 155.76 km in the state of Maharashtra, 4.3 km in the Union Territory of Dadra & Nagar Haveli and 348.04 km in the state of Gujarat with 12 stations along the route.
Upon completion, the High-Speed Rail will operate at a speed of 320 kmph, covering the entire distance in approximately two hours with limited stops and in three hours with all stops.
