L&T Construction bags orders worth Rs 2,210 crIllustrative image – not actual.

The construction arm of Larsen & Toubro (L&T) has bagged orders worth Rs 2,210 crore across two business segments.

The water effluent treatment business has secured orders worth Rs 2,044 crore.

A major turnkey order has been received from the Narmada Valley Development Authority (NVDA), government of Madhya Pradesh, for execution of Narmada-Kshipra multipurpose project to lift 15 cumecs of water from the Omkareshwar reservoir, of which 10 cumecs will help bring 30,000 ha of land under irrigation. The remaining five cumecs of water will cater to domestic industrial use in the Dewas, Ujjain Shajapur districts of Madhya Pradesh. 

The scope of works includes survey, design, procurement, construction installation of pumping systems, rising mains, transmission and distribution, among others.

Another EPC order has been received from the Hindustan Petroleum Corporation (HPCL) for execution of an integrated effluent treatment plant (IETP) for Visakh Refinery Modernisation project at Vishakhapatnam, Andhra Pradesh.

The project covers all modern technologies related to oil removal from refinery effluent, which includes SBR-based treatment of 1,000 cu mtr per hour refinery effluent, MBR-based sewage treatment system, wet air oxidation-based spent caustic treatment system and volatile organic compound control system.

The scope of work includes basic and detailed engineering, procurement, supply, construction, erection, installation, testing, commissioning of the IETP, which will cater to the future requirements of the existing projects and replace all existing ETPs of the Visakh refinery.

The heavy civil infrastructure business has secured orders worth Rs 166 crore. Geostructure, an arm of the heavy civil infrastructure business, has received a turnkey order from the Water Resources Department, Madhya Pradesh for execution of a composite gravity dam across the river Runj. The scope comprises design and execution of the composite gravity dam 1,176 mtr long with a height of 45 mtr, including spillway.

← All latest storiesBack to top →