Illustrative image – not actual.
The construction arm of Larsen & Toubro (L&T) has secured orders from clients for its varied businesses.
The buildings and factories business of the company has secured a design and build lumpsum turnkey order from a client in India to construct a Grade-A office space in two locations in Bengaluru, Karnataka , with a total built-up area of two million sqft with three basements + ground + 13 floors configuration.
The total seating capacity of both the projects combined will be 14,600. The scope of works includes civil/structure works, MEP, façade works, common area finishes and external development works. As part of the sustainable and green design initiatives, the project will be a Gold LEED certified building upon completion.
The water and effluent treatment business has secured an order from the Punjab Water Supply and Sewerage Board to provide surface-based bulk drinking water supply to Jalandhar town on design, build, operate and transfer basis.
The project is part of the Atal Mission for Rejuvenation and Urban Transformation (AMRUT) scheme.
The aggregate scope of the project includes design and construction of a raw water storage and sedimentation tank, raw water settling tank-cum-pump house, water treatment plant of capacity 275 MLD, clear water reservoir, underground storage reservoirs and pumping stations, raw and clear water transmission pipelines, associated electromechanical and instrumentation, control and automation works.
The project involves automation including measuring input and output water quantity and quality through suitable SCADA and other instrumentation works. The project is designed to cater safe and potable bulk drinking water to Jalandhar benefitting 13.8 lakh population and will help convert the existing ground-based water supply system in the town to a surface-based system.
L&T GeoStructure has been awarded projects to construct Down and Up Lines (Package-1 and -2) of a bypass grade separator in Katni district, Madhya Pradesh. The scope of work involves constructing around 2,800 piles, pile caps, piers, pier caps, superstructure, embankment with retaining walls, etc. The project duration is 36 months.
The aggregate value of the above projects is Rs 1,000 crore to Rs 2,500 crore.
