L&T bags pipeline contract from Cairn IndiaIllustrative image – not actual.

Larsen & Toubro bagged an order from Cairn India for the engineering procurement and construction (EPC) services for the export crude oil insulated pipeline and gas pipeline from Barmer in Rajasthan to Salaya in Gujarat.

The scope of work involves the laying of a cross country 24 inch skin heat traced pipeline with PUF insulation for crude oil transportation from the Mangala terminal, located at Barmer, Rajasthan to the Salaya oil export terminal, near Jamnagar.

The pipeline travels 330 km south from the Mangala Field to a pump station and oil take off point at Viramgam. From Viramgam the pipeline then continues for 261 km south west up to an Export oil terminal at Salaya.

Another pipeline of 8 inch diameter will be laid for transporting natural gas from the Raageshwari Fields which will be laid alongside the 24 inch pipeline to the Salaya receiving facility for feeding the gas generator sets located at 32 sites enroute.

Related Links:
Project profile

← All latest storiesBack to top →