L&T bags contract to build two parts of Mumbai Trans Harbour LinkIllustrative image – not actual.

The construction arm of Larsen & Toubro (L&T) has bagged orders worth Rs 8,650 crore to build two parts of the Mumbai Trans Harbour Link project.

 

Tenders have been invited by Mumbai Metropolitan Region Development Authority (MMRDA) for construction of Mumbai Trans Harbour Link, Packages 1 and 3.

The project involves construction of a 21.8 km bridge connecting Mumbai mainland with Navi Mumbai.

Package 1 of the project involves construction of a multi-level interchange at Sewri and a six lane marine bridge from Sewri to 10.38 km into the Mumbai bay, crossing over the Sewri mudflats, Pir Pau Jetty and Thane creek channels. The contract, secured in partnership with IHI Corporation, Japan, involves construction of an orthotropic steel deck crossing the various obligatory navigation channels which will be the first of its kind in India.

Package 3 involves the construction of a 3.6 km, six lane land bridge at Navi Mumbai connecting National Highway-4B and State Highway-54. L&T Construction will also build interchanges, rail over bridges and toll plazas.

← All latest storiesBack to top →