London-based Odia to invest Rs 125-cr in biobag manufacturing, battery recyclingIllustrative image – not actual.

A London-based company, Odia has announced plans to invest Rs 125 crore in three key projects in Odisha. These include manufacturing 100 percent plastic-free bio bags, recycling lithium-ion batteries, and processing maize seeds in the Nabarangpur district.

The announcement was made during the Utkarsh Odisha Conclave, where companies led by Arun Kar - Xpertnest and Earthnest, signed MoUs with the Odisha government. These projects are expected to generate 330 direct and 650 indirect employment opportunities. The first project focuses on establishing a plastic-free bio bag manufacturing unit with an investment of Rs 50 crore.

The factory, potentially located in Jagatsinghpur district, will produce 200 tonne of biodegradable and compostable bio bags annually, using renewable resources like cornstarch, cassava, and sugarcane derivatives. The plant is expected to be operational within nine months. Kar emphasised that replacing conventional plastics with eco-friendly alternatives would significantly reduce single-use plastic pollution and contribute to a cleaner environment. The second initiative involves setting up a Rs 50-crore lithium-ion battery recycling plant, addressing the growing need for sustainable waste management in the renewable energy and EV sectors.

The project will be developed in collaboration with a UK/Canadian technology partner and will employ advanced recycling methods to recover critical materials such as lithium, cobalt, and nickel from used batteries. A scientist from Cambridge University holds a patent in this technology, which will be leveraged to serve clients in India and internationally. This initiative supports the circular economy by reducing dependence on raw material imports and aims to provide 100 direct and 200 indirect employment opportunities.

The third project, a maize seed processing unit, will be set up in Nabarangpur district with a Rs 25-crore investment. With a completion timeline of nine months, the facility will enhance agricultural productivity and support local farmers, particularly tribal communities.

← All latest storiesBack to top →