LoA issued for highway project linking India, Myanmar, ThailandIllustrative image – not actual.
National Highways Authority of India (NHAI) has issued the letter of award (LoA) to Punj Lloyd and Varaha Infra joint venture (JV) for the construction of a two lane highway in the Kalewa-Yargi section of the proposed India-Myanmar-Thailand (IMT) Trilateral Highway.

The highway will connect India with Thailand through Myanmar. The 120 km road section will be built at a cost of Rs 1,177 crore. India has already built the 132 km section from the border town of Tamu to Kalewa.

A separate contract is underway for upgradation of 69 bridges along the Tamu-Kalewa stretch.

A detailed project report (DPR) is underway to build the Rih-Tedim road that will help connect the Trilateral Highway through Zokhawthar-Rih border in Mizoram.

India plans to extend road connectivity to the entire CLMV (Cambodia, Laos, Myanmar and Vietnam) region.

A preliminary survey has also been initiated for rail connectivity parallel to the Trilateral Highway. The government of Japan is interested in funding and collaborating with India in the trilateral rail project.

← All latest storiesBack to top →