Illustrative image – not actual.Consumer electronics and white goods company L G Electronics India Ltd (LGEIL) is planning to invest around Rs.500 crore over the next four or five years on expanding its existing plant at Noida in Uttar Pradesh and setting up of its second manufacturing facility either in Chennai or Gujarat. This was stated by Mr Kwang-Ro Kim, Managing Director of LGEIL.
The fresh investment, which would be made at a rate of Rs.100 crore every year, is part of the Rs.1,040 crore proposed to be invested by the Korean parent over a nine-year period beginning January 1997.
The Noida facility would have assembly lines for washing machines along with a compressor plant in 2002. It would also have assembly lines for colour televisions (CTVs), refrigerators and air conditioners at the 47 acre unit.
In line with the Korean parent's strategy of turning LGEIL into an export hub for several south Asian countries, LGEIL has decided to sub-contract manufacturing of CTVs and white goods in a major way. LGEIL plans to outsource 60 per cent of its products from local vendors. It aims to outsource CTVs and white goods from eight manufacturing units across the country. In addition to the current contract manufacturing tie-ups at Mohali and Hyderabad, the company is looking for similar arrangements in Kolkata, Nashik, Bhopal, Chennai and Ahmedabad.
Talks are underway for outsourcing CTVs from a subsidiary of West Bengal Electronics Industry Development Corporation Ltd (Webel). LGEIL is aiming at a production of one lakh CTVs from its Kolkata unit in 2002. This would require upgradation of infrastructure and input of technical know-how from LGEIL. Washing machines and microwave ovens may be outsourced from Webel at a later stage.
