Illustrative image – not actual.Ashok Leyland, the Chennai based commercial vehicle manufacturer, is likely to commence commercial production at its Pantnagar facility (Uttarakhand) by March 2010.
The plant, which has a capacity of rolling out 50,000 medium and heavy vehicles per year, is being set up at a cost of Rs 1,300 crore.
Meanwhile, Leyland is reviewing its manufacturing strategy with its JV partner Nissan for light commercial vehicles. The vehicles are expected to come out in the market by 2011. The company has also plans of manufacturing of construction equipment such as wheel loaders and tempo loaders with another JV partner, John Deer, with production scheduled to commence around the same time.
Also See:
Leyland-John Deere project to be delayed (10-Jun-09)
Related Links:
Project profile
