Illustrative image – not actual.The largest blast furnace of the country has become operational at Rourkela Steel Plant (RSP) on 10 August, 2013.
The blast furnace is being executed by Steel Authority of India (SAIL) at its RSP with an expenditure of Rs 1,600 crore. The furnace has a useful volume of 4,060 cu mtr, and will increase SAIL's hot metal capacity by 2.5 million tpa. With this operationalisation, hot metal capacity at RSP will increase to 4.5 million tpa from its present capacity of 2 million tpa.
With a daily hot metal production of 8,000 tpd, the furnace has an enhanced campaign life of 20 years, and is equipped with systems such as pulverized coal injection, cast house fume extraction, cast house slag granulation, high top pressure operation coupled with top gas recovery turbine, twin material bin bell-less top, waste heat recovery and conveyor belt charging.
Related Link:
Project profile
