Illustrative image – not actual.Larsen & Toubro (L & T) has signed a $23 million contract with Lafarge Surma Cement of Bangladesh for construction of a 17 km long cross-national belt conveyor connecting Lafarge Surma's proposed 1.2 m tonne cement unit in Northeast Bangladesh with limestone reserves in Meghalaya.
L & T would convey limestone and shale from the mines of Shell Bazar in Meghalaya to Chhatak of Bangladesh, where Lafarge would be putting up the cement plant.
The scope of the turnkey project undertaken in association with Aumund of France includes design, engineering, supply, construction, erection, testing and commissioning of the conveying system. The conveyor would follow the ground contour along its entire route and would have horizontal as well as vertical curves.
The construction division of L & T, ECC, would execute the longest belt conveyor of India, in a period of 24 months.
