Kudankulam ISTS Transmission transferred to Power Grid Corpn.Illustrative image – not actual.

Kudankulam ISTS Transmission, a wholly-owned subsidiary of Power Finance Corporation (PFC) Consulting (PFCCL), has been successfully acquired by Power Grid Corporation of India (PGCIL).

This development marks a significant step in the establishment of a transmission system under the inter-state transmission system (ISTS) to facilitate the evacuation of power from Kudankulam Units 3 and 4, each with a capacity of 1000 MW, totaling 2000 MW.

PGCIL, selected as the successful bidder under the tariff-based competitive bidding (TBCB) process, will develop the transmission system on a build, own, operate, and transfer (BOOT) basis.

Previously owned by PFCCL, the Kudankulam ISTS Transmission is a dedicated project special purpose vehicle (SPV) for the development of the necessary infrastructure for the evacuation of electricity generated by the Kudankulam nuclear power units.

With PGCIL’s expertise and leadership in the energy sector, the project is set to enhance the transmission efficiency and reliability of power distribution in India’s energy grid. This development is expected to bolster the national power supply, particularly focusing on supporting the grid capacity for high-capacity nuclear power projects.

← All latest storiesBack to top →