Illustrative image – not actual.The Kerala State Industrial Development Corporation (KSIDC) has invited EoIs from eligible parties for carrying out an Environment Impact Assessment study for its proposed mega power project at Cheemeni, Kasaragod district in Kerala.
The project envisages a 1,300 MW coal based thermal plant and a 1,100 MW gas based combined cycle power plant. The Kerala Government has earmarked 2,000 acre belonging to Plantation Corporation of Kerala for the project.
The last date of submission of bids is 30 November 2009.
KSIDC is also in the process of selection of a consultant for carrying out a detailed Techno-Economic Feasibility Report and a DPR to develop the project.
Meanwhile, a SPV is being floated with equal equity participation between KSIDC and the Kerala State Electricity Board to carry out the preliminary work. The SPV will be responsible for making available the necessary infrastructure for the project, finding a coal mining block and seeking all the regulatory clearances.
Also See:
KSIDC, GAIL to sign MoU for gas based infrastructure (14-Sep-09)
Related Links:
Tender
