Illustrative image – not actual.The scope of work involves survey, investigation, design, supply, erection, testing & commissioning of lift irrigation scheme (LIS) works for construction of civil and electro-mechanical works consisting of the following components:
Construction of intake canal, jack well-cum-pump house, delivery chamber, vertical turbine pumps/submersible pumps coupled to HT motor electrical panels, soft starter, capacitor, 110/33/6.6 kV electrical substation and power line, terminal bays, and seven tank under Yelaburga feeder under Koppal main branch with installation of surge protection system and SCADA arrangements for O&M of the system covered under the scope for five years from the date of completion in Karnataka on turnkey basis. The work will entail an investment of Rs 282 crore.
Construction of intake canal, jack well-cum-pump house, delivery chamber, vertical turbine pumps/submersible pumps coupled to HT motor electrical panels, 220/110/33/6.6/0.433 kV electrical substation and power line, terminal bays, MS rising mains for filling up five tanks at Kushtagi-Yalaburga-Koppal main, two tanks at Tavarageri branch, and SCADA arrangements including supply of spare parts and tools including requisite manpower for O&M of the system covered under the scope for five years on turnkey basis at a cost of Rs 772 crore.
Construction of intake canal, jack well-cum-pump house, delivery chamber, vertical turbine pumps/submersible pumps coupled to HT motor electrical panels, soft starter, capacitor, 220/110/33/6.6/0.433 kV electrical substation eight MI/ZP tanks Hosur feeder, 10 MI/ZP tanks Jalihal feeder and MI/Zp tanks under Hanumasagara branch with installation of surge protection system and SCADA arrangements with O&M of the system covered under the scope for five years from on turnkey basis. The work will be completed at a cost of Rs 576 crore.