KRCL invites bids for construction of bridgesIllustrative image – not actual.

Konkan Railway Corporation has invited bids for pre-qualifiying contractors for design and construction of Anjikhad and Chenab bridge as a part of Jammu-Udhampur-Srinagar-Baramulla railway line. The scope of work for two bridges include:

Anjikhad Bridge

  • Length of bridge is 657 m
  • height 186 M from bed level
  • Formation level + 780 M
  • Located 23 km north of Katra

Chenab Bridge

  • Length of bridge is 1263 M
  • Height 359 M from bed level
  • Formation level + 850 M
  • Located 60 km north of Katra

Both bridges are trageted for completion by 31 December 2006.

Last date for submission of bids is 20 January 2004

For more details, please visit www.konkanrailway.com

← All latest storiesBack to top →