Illustrative image – not actual.
Krishnapatnam Railway Company (KRCL) has received an investment to the tune of Rs 125 crore from Sagarmala Development Company.
The finance received is for development of the rail corridor connecting Obulavaripalli and Krishnapatnam Port.
The Krishnapatnam Railway Company is a SPV joint venture (JV) by Rail Vikas Nigam for connecting 114 km Obulavaripalli (Kadapa district) and Krishnapatnam (Nellore) in Andhra Pradesh. The entire cost of the project is estimated at Rs1,850 crore.
A 21 km section of the project line from Krishnapatnam to Venkatachalam is fully operational in single line since July 2009 and was converted to double line in March 2014.
The new rail corridor connecting Kadapa city with Krishnapatnam Port will help optimise costs, accelerate growth by improving the city’s EXIM competitiveness. It will reduce transit time drastically by offering a direct entry into the port.
Under Phase-II which is from Obulavaripalle to Venkatachalam (94 km) the progress of rail construction work is in full swing. Track linking of the entire length has already been completed.
The overhead equipment and signal & telecommunications works are in advanced stage of completion.
