Illustrative image – not actual.The Kandla Port Trust (KPT) has initiated work on the expansion of the port’s infrastructure. The project includes expansion of the existing port area of 117 hectares by 67 hectares.
KPT has also commenced construction of berth No.11, which would be commissioned by June 2003. This berth would enable berthing of Panamax vessels of 65,000 DWT for a draft of 13.5 metres. Presently, the port is capable of berthing vessels with only 45,000 DWT.
The Trust is also investing Rs.40 crore in a joint venture for installation of Vessel Traffic System in the Gulf of Kachchh, which would help maintain a high profile surveillance system on the ships trying to reach the port.
As part of its plans to improve its infrastructure, KPT also proposes to bear about 30 per cent of the Rs.345 crore gauge conversion project between Samakhiali and Palanpur undertaken by the Indian Railways. This project is expected to help the port users to move their cargo more quickly.
Further, the Trust has also undertaken construction of the additional covered and open storage facilities at a cost of Rs.35 crore and plans to invest a similar amount to get five more ELL Wharf cranes by 31 March 2003.
