Illustrative image – not actual.Karnataka Power Corporation (KPCL), has invited bids for supply of 1.5 million tonne of imported coal for its thermal power station at Raichur district of the state.
The company requires this quantity of imported coal for over a period of 12 months. The required coal will be blended with indigenous coal at the unit.
The scope of the bids includes arrangement of transportation of coal from coal mines abroad through ships to the unloading port in India; unloading the coal from the ship in India as per the delivery schedule with the prior written permission of KPCL; loading the coal into railway wagons and despatching the wagons to the plant site.
The selected bidder will also be required to facilitate and cooperate with third party sampling and analysis of imported steaming coal at the loading port and unloading port through IA loading and IA unloading respectively.
