KPC Projects emerges as lowest bidder for ICP connectivity works in UttarakhandIllustrative image – not actual.

KPC Projects has emerged as the lowest (L1) bidder for works for the development of the Banbasa Integrated Check Post (ICP) connectivity project in Uttarakhand on the India–Nepal border.

The scope includes the construction of bridges, underpasses, and a rail over bridge (ROB) to ensure uninterrupted connectivity and efficient traffic flow. The contract, valued at approx. Rs 300 crore, has been tendered on an engineering, procurement and construction (EPC) basis. The project is a key infrastructure initiative that will provide dedicated four-lane access to the Integrated Check Post through a 3.86-km corridor designed to facilitate seamless cross-border movement.

With the L1 position, KPC Projects expectsto strengthen its infrastructure portfolio, subject to the formal award of the contract, while contributing to regional economic growth and cross-border connectivity.

 

← All latest storiesBack to top →