Illustrative image – not actual.
KPC Projects has been declared as the lowest bidder (L1) for the construction of a football stadium complex on engineering, procurement and construction (EPC) basis at Mawkhanu in Meghalaya.
The project is required to be designed and constructed to the standards of latest FIFA football stadium guidelines, guide to safety of sports grounds (The GREEN Guide) for design of complex, design of spectator seating, lighting, fire and life safety, security provisions and air quality and ambient conditions.
KPC Projects emerged as L1 with a bid of Rs 642.05 crore.
The financial bid was opened on 26 May, 2025.
The proposed work is scheduled to be completed within 36 months.
