Illustrative image – not actual.Konkan Railway has invited bids for constructing 16 road over bridges (ROBs) in Jharkhand. These ROBs would replace the existing level crossings on Eastern & South Eastern Railways in the state.
The ROBs are to be completed in 12 months period excluding the monsoon. These ROBs have been divided into 6 packages as shown in the table below.
|
Package |
Railway |
Level Crossing No /
Chainage |
Section |
Between Stations |
District |
|
1 |
SER |
213/21-23 |
Howarh-Nagpur |
Ghatsila-Galudi |
Purbi Singhbhum |
|
SER |
390/57-59 |
Adra-Tata |
Kunki-Kandra |
Paschimi Singhbhum |
|
|
SER |
378/19-21 |
Chandil-Sini |
Chandil-Manikuy |
Paschimi Singhbhum |
|
|
SER |
312/25-27 |
Howarh-Nagpur |
Chakradhapur-Lotapahar |
Paschimi Singhbhum |
|
|
|
|||||
|
2 |
SER |
414/12 |
Ranchi-Tata |
Namkum-Ranchi |
Paschimi Singhbhum |
|
SER |
419/13 |
Ranchi-Hatia |
Ranchi-Hatia |
Paschimi Singhbhum |
|
|
|
|||||
|
3 |
ER |
1/B/T |
Dhanbad-Gomoh |
Dhanbad-Bhuli |
Dhanbad |
|
ER |
8A |
Asansol-Dhanbad |
Thaparnagar-Kalubhatan |
Dhanbad |
|
|
ER |
18/B/T |
Asansol-Dhanbad |
Dhokra-Dhanbad |
Dhanbad |
|
|
|
|||||
|
4 |
ER |
15/A/T |
Gomoh-Gaya |
Parasanath-Chergo |
Giridih |
|
ER |
3/A/E |
Dhanbad-Gomoh |
Bhuli-Tetlumari |
Dhanbad |
|
|
ER |
12/A/T |
Phusro-Amlo |
Phusro-Amlo |
Giridih |
|
|
|
|||||
|
5 |
ER |
6/B/T |
Barkakana-Barwadih |
Ray-Khalari |
Hazaribhag |
|
ER |
13/B/E |
Barwadih-Garhwa Road |
Daltongunj-Kajri |
Palamu |
|
|
|
|||||
|
6 |
|
30/B |
Asansol-Jhajha |
Simultala-Jasdih |
Munger |
|
|
38 |
Sainthia-Barharwa |
Pakur Station-HWH Station |
Sahiganj |
|
Last date for
submission of bids: 20 June 2002
More details about the projects could be obtained at www.konkanrailway.com
