Kolkata port to float RFQs for two projectsIllustrative image – not actual.

The Kolkata Port Trust (KoPT) plans to invite RFQs for two projects soon.

The RFQs are to be floated for the proposed Haldia Dock II project by October 2010 and for Sagar port project by early 2011. Currently, the DPRs are being prepared for both the projects. The West Bengal Government has already allotted about 200 acre for Haldia Dock II project. The KoPT is likely to reclaim 200 acre at Shalukkhali in East Midnapore for Haldia Dock project.

The Sagar port is likely to be built in PPP mode at an investment of Rs 2,000 crore. Once operational, this port facility with a draft of nearly 11.5 mtrs will be able to handle about 60 million tpa of cargo.

← All latest storiesBack to top →