Kolkata Metro partners with ABB to enhance electrification, and energy efficiencyIllustrative image – not actual.

Kolkata Metro, India’s first Metro system established in 1984, has partnered with ABB to upgrade and enhance the efficiency, reliability, and safety of its expanding urban transit network.

The collaboration supports both underground and elevated corridors across the 72-km system, which currently operates more than 300 train trips daily and serves over half a million passengers. The deployment of ABB’s advanced electrification and motion-control solutions is aimed at improving operational continuity, optimizing energy use, and strengthening passenger safety across key infrastructure points. The installed solutions include low-voltage and medium-voltage gas-insulated switchgear, lightning protection systems, distribution boards, and variable frequency drives (VFDs), all designed to enhance space efficiency, reduce downtime, and ensure stable power distribution across stations and tunnels. ABB Motion’s HVAC-dedicated packaged drives play a critical role in managing ventilation and cooling systems, ensuring passenger comfort during operations and supporting smoke extraction during emergencies, while delivering energy savings of around 25 percent.

These solutions have been implemented across major corridors and stations, including Sealdah–Phoolbagan, Joka–Majerhat, Airport, Blue Line routes, and India’s largest underground metro station, Jai Hind Bimanbandar. The partnership strengthens Kolkata Metro’s infrastructure modernization and supports its transition toward a more sustainable, energy-efficient, and reliable urban mobility system. Kiran Dutt, President – Electrification, ABB India said “As India accelerates its journey toward low-carbon, smart urban transit, the need for highly efficient and intelligent solutions has never been more urgent. Today, ABB’s broad portfolio of technologies are helping our customers drive efficient operations across 80% of the nation’s metro rail networks.”

 

← All latest storiesBack to top →