Illustrative image – not actual.KNR Constructions has received a letter of award (LoA) for the construction of a four-lane elevated corridor along East Coast Road (ECR) in Chennai.
The road section will stretch from design chainage km 11+480 to km 11+800 at West Avenue Road and extending up to km 24+780 from Thiruvanmiyur to Uthandi in SH-49. The contract will be executed on a hybrid annuity mode (HAM) basis with a bid cost of Rs 2,163.07 crore. The construction period is scheduled for 36 months, followed by an operation period of five years from the commercial operation date. The elevated corridor is expected to improve traffic flow, reduce congestion, and enhance connectivity along the busy ECR corridor, benefiting commuters and commercial transport alike.
KNR Constructions will handle all aspects of design, engineering, and construction, ensuring compliance with modern infrastructure standards and safety norms. This project strengthens regional transport infrastructure and reflects ongoing investments in urban mobility solutions along key arterial roads in Tamil Nadu.
