KNR Constructions bags orderIllustrative image – not actual.

KNR Constructions has bagged an order from Sadbhav Engineering.
 
The order worth Rs 580.17 crore is for rehabilitation and upgradation to two-lane with paved shoulders and maintenance of (i) Chhhindwara - Linga - Umarnala - Saoner Section of NH-26B (from Ch. 1.000 Km to 87.00 Km - Length 86 Km) including Part of Chhindwara bypass (Km 23.553 to Km. 29.275 - length - 5.722 Km), and (ii) Multai (Km. 244.425) upto near Imlikhera (Km 167.700) - length 76.725 Km" in Madhya Pradesh and Maharashtra. The order is to be completed within a period of 36 Months from the appointed date.

Related Link:
Project profile

← All latest storiesBack to top →