Illustrative image – not actual.An SPV, Kolkata Metro Rail Corporation (KMRC), will be formed for implemention of the Kolkata east-west metro corridor in Kolkata.
On 21 May 2008, EoIs are invited for general consultancy services for implementing the Rs.4,676 crore ambitious metro corridor project. The project envisages construction of a metro rail corridor in length of 13.77 km spanning through 12 stations. Of the total length, around 8 km will be built underground and the rest length elevated. The metro corridor will start at Hawrah and ending at Salt Lake and will cover six stations underground and six elevated. The project cost will be financed through the State and Central government (55 per cent) and Japan Bank for International Corporation (45 per cent). Delhi Metro Rail Corporation (DMRC) has already prepared a DPR during March 2006 for the project.
Related
Link:
Project Profile
