Illustrative image – not actual.
Khilari Infrastructure has been declared the lowest (L1) bidder for the survey, design, and execution of the sewerage scheme for Dal Lake Uncovered Areas Pollution Abatement in Kashmir, Jammu & Kashmir.
Issued by the Urban Environmental Engineering Department of J&K, the order is valued at Rs 279.99 crore and will be executed on an EPC fixed cost turnkey basis. The contract includes operation and maintenance for five years after successful completion of a free trial run. The completion period is set at 30 months, excluding a six-month free trial run, followed by a 24-month defect liability period( DLP) after the trial.
This initiative aims to significantly improve the environmental health of the Dal Lake region by controlling pollution and upgrading sewerage infrastructure, contributing to sustainable development in Kashmir.
